In march I drove my frame down to West Union, Ohio to get my frame stippled by David Bowie ( http://www.bowietacticalconcepts.com ). He told me the turn around time on it would be 2-3 months but it only took about a month. It is a lot more aggressive than the deck tape I've been using and my own stippling I tried; which he cringed at when he saw it. I had the 360 stippling done, and the finger grooves removed. The price was $170. Heres some pics.
I'm impressed.