EkuJustice Posted December 5, 2010 Share Posted December 5, 2010 When using a lee single stage for resizing, with screws work to hold the loader down in the front 2 holes or are 4 bolts needed Link to comment Share on other sites More sharing options...
GuyC Posted December 5, 2010 Share Posted December 5, 2010 I have a bolt and a screw holding mine down. Link to comment Share on other sites More sharing options...
rsrocket1 Posted December 7, 2010 Share Posted December 7, 2010 All bolts tightened down into a 2x4 through the table. The 2x4 is cut so that it reaches across the loading bench all the way to the wall. There is then a bookshelf bracket which is fastened to the 2x4 and into the studs of the wall. For .223, there was flex on the mount, but I could hold the front part of the Challenger press to steady it enough. When going to .308, I beefed up the whole mount with the 2x4 and with the wall support, there is no flex anywhere. For my LnL AP I do the same thing, except I use a 2x6 and it is stiff, stiff, stiff Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now