jid2 Posted September 4, 2013 Any new info on the POGO Dot? Looking to review samples of the lens coating this week from a supplier, and get them on order. Lead-time is about 4 weeks. In the mean time I'm working through the design of the fixturing to machine the parts. Right now my plan is to build the first 50-100 units on the brand new machine we are installing at my day job. I'll plan to come in for some long weekends to get things kick started. But I'll still need to build and validate the V2 design before ramping into production. That will take around 4 weeks, and starts after I get the custom lens. I could create a Microsoft Project Gantt chart of the schedule, but that would feel too much like my day job. Share this post Link to post Share on other sites
ChuckS Posted September 4, 2013 Any new info on the POGO Dot? Looking to review samples of the lens coating this week from a supplier, and get them on order. Lead-time is about 4 weeks. In the mean time I'm working through the design of the fixturing to machine the parts. Right now my plan is to build the first 50-100 units on the brand new machine we are installing at my day job. I'll plan to come in for some long weekends to get things kick started. But I'll still need to build and validate the V2 design before ramping into production. That will take around 4 weeks, and starts after I get the custom lens. I could create a Microsoft Project Gantt chart of the schedule, but that would feel too much like my day job. Well, then can't you do just a little power point? Share this post Link to post Share on other sites
Guest Posted September 4, 2013 Any new info on the POGO Dot? ... I could create a Microsoft Project Gantt chart of the schedule, but that would feel too much like my day job. And reading said MS Project Gantt chart in this thread would feel too much like work, also! You will know when it is ready, and so will about 500 of your closest friends after you post about your success! We don't need no stinkin' chart! Good Luck! Share this post Link to post Share on other sites
Ken_Bird Posted September 4, 2013 +1 on we do not need anything. Spend your time making the first ones. We can figure out the details after we have one. Best of luck, hope you do very well with this endeavor. Share this post Link to post Share on other sites
BEC Posted September 4, 2013 Really cool, but not sure I'm ready to switch yet. Share this post Link to post Share on other sites
caspian guy Posted September 4, 2013 Any new info on the POGO Dot? Looking to review samples of the lens coating this week from a supplier, and get them on order. Lead-time is about 4 weeks. In the mean time I'm working through the design of the fixturing to machine the parts. Right now my plan is to build the first 50-100 units on the brand new machine we are installing at my day job. I'll plan to come in for some long weekends to get things kick started. But I'll still need to build and validate the V2 design before ramping into production. That will take around 4 weeks, and starts after I get the custom lens. I could create a Microsoft Project Gantt chart of the schedule, but that would feel too much like my day job. If you make a gantt chart I may refuse to buy one ;-) that would be way too much like work. Share this post Link to post Share on other sites
jid2 Posted September 4, 2013 (edited) Haha - the people have spoken - gantt chart is OUT! Edited September 4, 2013 by jid2 Share this post Link to post Share on other sites
jriera Posted September 4, 2013 Here you are .. done it for you ... now .. get busy building the POGO Dot!! Share this post Link to post Share on other sites
outerlimits Posted September 5, 2013 Gannt charts r gay Share this post Link to post Share on other sites
Tactica Posted September 5, 2013 (edited) Interested, add me to the list. Very cool design. Did the question about Wind / Elev adjustments on this get answered? Edited September 5, 2013 by Tactica Share this post Link to post Share on other sites
jhernandez Posted September 6, 2013 I should be on the list, I'd like blank mount though, no pre drilled holes. Share this post Link to post Share on other sites
george76904 Posted September 7, 2013 Is it possible to be on the beta testers list? I have followed this thread for a while and MAN am I interested. But I dont have an extra $500 right now. so you know... Share this post Link to post Share on other sites
scunick Posted September 7, 2013 I am interested, but live on the other side of the world ... So as soon as you have it tied up and reliable I want one B-)<br /><br />Sent from my HTC One using Tapatalk 4<br /><br /> Share this post Link to post Share on other sites
lvipscshooter Posted September 10, 2013 Definately interested in seeing the finished product. Put me on the list and let me know how much $'s when ready. We have several guys on our team that would probably be interested as well Share this post Link to post Share on other sites
jid2 Posted September 10, 2013 Hit a major milestone on the non-existent Gantt chart... Custom lenses are on order, should have a large number of them in 4 weeks. Share this post Link to post Share on other sites
Hammar Posted September 10, 2013 Hit a major milestone on the non-existent Gantt chart... Custom lenses are on order, should have a large number of them in 4 weeks. Awesome. Can't wait to see the final product. Share this post Link to post Share on other sites
andersonj55126 Posted September 10, 2013 Are you using the cmore dot module? Share this post Link to post Share on other sites
jid2 Posted September 10, 2013 Are you using the cmore dot module? No, there are zero common parts with a Cmore, everything is custom. Share this post Link to post Share on other sites
RocketCity1911 Posted September 10, 2013 jid2 - Can you give us some status on any endurance testing you've been doing? Is it holding zero? Battery life? Anything getting loose? Etc.? Share this post Link to post Share on other sites
jid2 Posted September 10, 2013 (edited) My 1st proto has been holding up well, but it's just been shot in matches, so it doesn't have an extreme number of rounds through it. But the 2nd proto, which will be the revised design using the custom optic will get run through a serious test. I plan on loading up a case of ammo and running it through the gun in a single session checking zero every couple hundred rounds. I want to do my best to make sure it will be reliable, and I can't get enough rounds through it shooting matches (in a short time span). Edited September 10, 2013 by jid2 Share this post Link to post Share on other sites
Hammar Posted September 10, 2013 I volunteer to help with the testing! Share this post Link to post Share on other sites
idHawk Posted September 11, 2013 I have been following this thread but do not recall if this question has been asked. Have you tested this optic on any Open Gun with Popple Holes? They can wreak havoc on the scope mounts at times, especially the ones on a Hybrid Barrel. Do you have any idea how this would hold up if mounted on such a platform? Share this post Link to post Share on other sites
pharoh Posted September 11, 2013 Would be awesome to try one of these on my soon to own czechmate :-) Would be sweet to be the first one in canada to sport this optic Share this post Link to post Share on other sites
euxx Posted September 11, 2013 Would be awesome to try one of these on my soon to own czechmate :-) Would be sweet to be the first one in canada to sport this optic Mount holes and frame/slide dimensions of Czechmate are quite different from regular 2011-frame guns... Share this post Link to post Share on other sites
pharoh Posted September 11, 2013 :-( the creator should make one for the czeckmate "wink wink" would be cool Share this post Link to post Share on other sites